Callback form
Name
Phone
Time to call
 
export@rudgormash.ru

Tel: +7(473) 244-70-12

News

 
16.02.2017
      The drill sent for export was loaded on four railway platforms on February 15 and started its long way to the customer. SBSH-250MNA-32 drilling rig has been manufactured according to the customer’s confirmed technical specification (the TS). We remind you that every T
 
10.01.2017
 The autumn exhibition season of ITE Uzbekistan company completed with three international exhibitions “MiningWorld Uzbekistan”, “Machinery Central Asia” and “TransUzbekistan” that took place in 16-18 November, 2016. The exposition was located in two showroom
 
08.11.2016
    Rudgormash received visitors from PJSC “Stoylenskiy GOK” on October 25, 2016 who had come for preliminary acceptance of the drilling rig SBSH-250 that had been manufactured by that time and was being prepared for the shipment. The drilling rig fundamentally differs from


 

Home

News archive

     
 
Date -
Question
 
     
 
      The drill sent for export was loaded on four railway platforms on February 15 and started its long way to the customer. SBSH-250MNA-32 drilling rig has been manufactured according to the customer’s confirmed technical specification (the TS). We remind you that every T

 
 The autumn exhibition season of ITE Uzbekistan company completed with three international exhibitions “MiningWorld Uzbekistan”, “Machinery Central Asia” and “TransUzbekistan” that took place in 16-18 November, 2016. The exposition was located in two showroom

 
    Rudgormash received visitors from PJSC “Stoylenskiy GOK” on October 25, 2016 who had come for preliminary acceptance of the drilling rig SBSH-250 that had been manufactured by that time and was being prepared for the shipment. The drilling rig fundamentally differs from

 
    XXII Mining World Central Asia Exhibition “Mining equipment, production and concentration of ores and minerals” took place in Almaty between 14 and 16 September 2016. This is the largest and most reputable international exhibition of mining and metallurgical complex in Ka

 
  After-sale service engineers of MMHC Rudgormash -Voronezh together with service engineers of JSC “Mining machines” performed installation and commissioning of the rotary drilling rig SBSH-250MNA-32 with the serial number 1582 manufactured by LLC MMHC Rudgormash-Voronezh on the te

 
  Another ceramic filter KDF-75 with ceramic filtrating elements was shipped to a customer in the beginning of August. The filter was designed by technical research center “Bakor”, “Filter engineering” company and manufactured by LLC “Concentrating equipment&rdquo

 
  The meeting with the delegates from Indonesia headed by Ambassador Extraordinary and Plenipotentiary of Republic of Indonesia Mr. Wahid Suprijadi took place in the Russian Chamber of Trade and Commerce of Voronezh region on Aug. 25. During this meeting the parties discussed promising direct

 
  The parties held a number of essential negotiations with the chairman of tender commission and top management of VINACOMIN, directors of Coalimex company and Cao Son coal mine, during which the parties agreed upon usefulness of further business cooperation and reached a number of agreements.

 
  On the 2nd and 3rd of June 2016 the alignment-meeting related to concentrating equipment was held. This meeting was held by the specialists of the LLC “Concentrating Equipment” for the technical, operational and commercial services of the purchasers; and this company is a part of

 
RUDGORMAS Company continues to upgrade the manufactured equipment. The comfort of the operator’s cabin is as important for the Company top management as the technical improvement of the drill.  Vladimir Glazunov, the head of Rudgormash design office, told us about remodeling of the opera

  «MMC RUDGORMASH»
tel/fax +7 (473) 244-70-12
E-mail: export@rudgormash.ru